5 Easy Facts About timber summer house Described
I dug a hole 400mm deep and positioned Each and every write-up into it. The article was secured set up using a bag of premixed concrete poor that just needed water adding to it and no mixing and sets within just 30 minutes. I took treatment to ensure Every single post was buried exactly the same depth, vertically stage and square with one another.